Project: EaglesWing   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Todd Luebstorf   -  
Project:   Zenith CH750SD   -   VIEW REPORTS
Total Hours:496.7
Total Flight Time:
Start/Last Date:Dec 12, 2019 - No Finish Date
Engine:Viking 195
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=EaglesWing

Home or Last Project Picture

Sep 03, 2023     R/H Wing - (3.8 hours)       Category: Wings
Removed the 4 bolts for the R/H wing spar inboard bracket by the #1 nose rib. Removed the bracket so I have room to rivet the nose rib, L angle, and slat support angle. Installed those parts with A5 rivets. Installed the bracket and bolts that were removed from the spar. Torqued the bolt to 20 in. lbs. Torqued the 8 bolts that attach the nose ribs 4,5,6,7,8 to the spar to 20 in. lbs. Rivet the slat support angles on ribs 4,7,8 with A5 rivets. Cleco and rivet the tank Z angles, SD75W9-2 and 3 shorter trailing edge ribs to the aux rear spar, SD75W3-4, with A5 rivets. Cleco and rivet the aux rear spar to the side of the tank ribs with A5 rivets. Cleco the rear spar parts together to figure out how it goes. Drilled the 3 holes on each of the rear ribs where the rear spar attaches to a #21. They only had pilot holes.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.